Where do you maintain the duration of a product on operation?
D
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2
correct answers to this question.
B, D
You want to perform capacity availability checks on your production orders. What must be set for this
to occur? Note: There are 2 correct answers to this question.
A, B
Your production planners must execute planning only for specific resources. How can you achieve this
in Advanced Planning (PP"/OS)?
D
Which materials have a negative quantity in a bill of materials or in a recipe? Note: There are 3
correct answers to this question.
A, C, E
The MRP run detected a shortage of a material that you source from an external supplier in full
pallets. How can you make sure you will only receive full pallets?
C
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.
A, B, C
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct
answers to this question.
A, B
Which options do you have to plan both quant ties and capacities during line loading in repetitive
manufacturing? Note: There are 2 correct answers to this question.
B, C
MRP created a planned order for a material that has one single material from stock as a component.
What happens to this dependent requirement when you convert the planned order into a production
order?
B
You want to insert an operation at a certain time on a work center. The planning direction is forward.
The desired dispatching time coincides with an operation that has previously been dispatched. How
does the insertion take place?
B
In which data objects do you maintain the production line as the work center for repetitive
manufacturing? Note: There are 2 correct answers to this question.
A, C
Which time elements can be reduced by a reduction strategy? Note: There are 3 correct answers to
this question.
C, D, E
If you use floats to limit dispatching in capacity planning, what type of time element can be reduced
by strategy settings while dispatching?
A
What are the possible results of a production planning run in Advanced Planning (PP/OS)? Note:
There are 3 correct answers to this question.
C, D, E