Questions for the H35-560 were updated on : Dec 01 ,2025
Which of the following adjustment measures has the highest priority?
C
Which signaling is triggered by the statistics of the number of successful establishments of the RRC
connection establishment?
C
Which of the following statements about LTE tools is correct? (Multiple Choice)
ABC
In the downlink scheduling, which factors will affect the allocation of downlink shared resources and
the selection of MCS? (Multiple Choice)
AB
During the test, the bit error rate below 20% is normal.
B
If the UE fails to switch, it is mostly characterized by dropped calls, RRC reestablishment, and so on.
A
About the inter-frequency handoff based on the coverage, receive which of the following event will
start GAP (inter-frequency) measurements?
B
Regarding TA planning, which of the following statements is incorrect?
C
Which of the following channel or signal is used to cell PCI identification and cell search process?
C
Regarding the over-zone, overlapping coverage control, which of the following statements is wrong?
D
In large, medium and small cities, many streets have tall buildings on both sides. To avoid time
dispersion, the cell antenna azimuth of nearby base station cannot be installed on the street.
A
The single-station verification test only needs to verify whether the cell status in the idle mode is
normal.
B
Which of the following format files can the Log file be converted to? (Multiple choice)
ABC
Which of the following events is the basis for LTE synchronous frequency switching?
C
LTE power control does not affect the coverage and capacity of the system.
B